CLIENT
Firethorn Trust Limited

VALUE
£50m

LOCATION
Cheshire

STATUS
Planning

FFT Port Cheshire

New Build Industrial & logistics units to be speculatively brought to market. The project includes remediating the entire site, once used as a paper mill to bring forward a sustainable development that will achieve the following:

•   BREEAM ‘Excellent’
•   WELL ‘Ready’
•   Net Zero Carbon ‘Ready’
•   700k sqft + of Employment space planned
•   Brownfield Regeneration in a designated Employment Area
•   5% Electric Vehicle Charging
•   Biodiversity Net Gain required

The building has been let to Survitec who produce healthcare equipment among other things. The125,000 sft of employment space has created thousands of jobs for the area and 2 electric charging vehicles have been installed in the car park outside.